KPMG Partners Meetings & Studio Broadcasts
Lake Nona, FL
2021 - 2022 - 2023 - 2024 Partners Meetings and Studio Broadcasts

Cameras Shader and Video Assistant Engineer.

Project Manager: Jacob Neumann -  Director of Event Technology (Encore)

SeaWorld Penguin Trek - Media Day - Orlando, FL
July 2024

Cameras Shader and Video Assistant Engineer.

Project Manager:  Dan Sweeney (MegaPixe Pro)

Karate Combat - KB2 - Playa del Carmen, MX
March 2024

Cameras Shader and Video Assistant Engineer.

Project Manager: Todd Ferrante (ITP Productions)

Premiere - Ulta Beauty - Orlando, FL
June 2023

Cameras Shader and Video Assistant Engineer.

Project Manager: Scott Austin (4 Productions)

Wealth Management EDGE Conference - Inside EFTs
Hollywood, FL
May 2023

Systems Engineer (EIC). In charge of local crews for Load in/out, installation logistics (power/fiber/copper runs, DAs, signal conversions), bringing Video, Media Servers, GFX/Playback Worlds on-line, direct client interaction. Daily changes and add-ons to accommodate talent/client. 

Project Manager: Bob Krysa (Fuse)

Motive Partners Annual General Meeting – NY, NY
November 2022

Cameras Shader and Records. Video Assistant Engineer.

Project Manager: Gary Madura (Fuse)

Tyler Perry VIP Wrap Party with Usher – Atlanta, GA
June 2022

Cameras Switcher  and Shader. Video Assistant Engineer.

Project Manager: Luke Pilato (Fuse)

TWICE Live in Concert – Los Angeles, CA
May 2022

Video Monitors Engineer. 

Project Manager: Patrick Eaton (Fuse)

2022 Annual International Shareholders’ Meeting
Fayetteville, AR
May 2022

LED Engineer. 

Project Manager: John Beagle (Fuse)

iHeart Country – Austin, TX
November 2021

Video Assistant Engineer for installation logistics (fiber/copper runs, DAs).
Supervised local crew during Load in/out.
Cameras Shader on Rehersal and Show days.

Project Manager: Bob Suchocki (4Wall Entertainment) 

The Event – Las Vegas, NV
October 2021

Video Assistant Engineer for installation logistics (fiber/copper runs, DAs).
Supervised local crew during Load in/out.
Cameras Shader on Rehersal and Show days.

Project Manager: Bob Suchocki (4Wall Entertainment) 

iHeart Jingle Ball – New York, NY
December 2019 

BOH Engineer in charge of local crew for Load in/out (Thirty TVs in multiple locations displaying multiple feeds), installation logistics (fiber/copper runs, DAs, signal conversions), truck I/O relationships, direct client interaction. Daily changes and add-ons to accommodate talent/client.

Project Manager: Grace Cornejo (Joe Lewis Company)

Reminiscence (Movie) – New Orleans, LA
December 2019

Systems Engineer. Media Servers 4K playback troubleshooting , Visual Integration Technologies, Fiber/Copper/Network runs

Project Manager: Fred Waldman (Fuse)

Mandalorian – Manhattan Beach, CA
September 2019

Systems Assistant Engineer. Installation of Mandalorian Season 2 Virtual Set. Visual Integration Technologies, Fiber/Copper/Network runs. Inventory Control.
End Client: Industrial Light & Magic (ILM)

Project Manager: Mitch Lathrop (Fuse) 

Keep Memory Alive – Las Vegas, NV
March 2019

BOH Engineer, in charge of local crews for Load in/out (Thirty TVs in multiple locations displaying multiple feeds), installation logistics (fiber/copper runs, DAs, signal conversions), direct client interaction. Daily changes and add-ons to accommodate talent/client.
Cameras Shader on Rehersal and Show days.

Project Manager: Bob Suchocki (4Wall Entertainment) 

iHeart Jingle Ball – San Francisco, CA
November 2018 

Systems Engineer (EIC).  In charge of local crews for Load in/out, installation logistics (power/fiber/copper runs, DAs, signal conversions), bringing Video, Media Servers, GFX/Playback Worlds on-line, direct client interaction. Daily changes and add-ons to accommodate talent/client.

Project Manager: Bob Suchocki (4Wall Entertainment) 

Tidal X – New York, NY
July 2018

Media Servers Assistant Engineer and BOH Engineer. Supervised local crew for Load in/out (Forty TVs in multiple locations displaying multiple feeds), installation logistics (fiber/copper runs, DAs, signal conversions), direct client interaction. Daily changes and add-ons to accommodate talent/client.

Project Manager: Bob Suchocki (4Wall Entertainment) 

Licencing Expo – Mandalay Bay - Las Vegas, NV
June 2014 - 2015 – 2016 - 2017

Systems Engineer, installed, teched and operated Saban booth featuring a large LED wall, projection, playback rack (Catalyst V5) and several TVs. Direct client interaction during show days. Daily verification of equipment status, content updates and formatting. Prep in Glendale and Las Vegas. Supervised local crew during Load in/out for all clients (WB, Fox, DreamWorks, Mattel, Saban).

Project Manager: Joseph “Fluffy” Denham (2014-2015) (VER)
Colin Feeney (2016 - 2017) (VER)

Disney’s Hollywood Studios – Orlando, FL
May 2016 – November 2017

Systems Assistant Engineer. Installation of Star Wars Spectacular's Hippotizer Media Servers and supporting hardware (fiber/copper runs, DAs, signal conversions, TVs). Direct client interaction. In charge of installing and testing all equipment in the control rooms.

Project Manager: Martin Wickman (VER)

iHeart Festival – Las Vegas, NV
September 2015 – 2016 - 2017
June 2014 - 2015 – 2016 - 2017

BOH Engineer, in charge of local crews for Load in/out (Eighty TVs in multiple locations displaying multiple feeds), installation logistics (fiber/copper runs, DAs, signal conversions), truck I/O relationships, direct client interaction. Daily changes and add-ons to accommodate talent/client.

Project Manager: Todd Mertzel (2015) - MGM Grand – Las Vegas, NV) (VER)
Bryan Barry (2016 – 2017) - T-Mobile Arena – Las Vegas, NV) (VER)

iHeart Country Festival – Austin, TX
April 2016 - 2017

BOH Engineer, in charge of local crews for Load in/out (Forty TVs in multiple locations displaying multiple feeds), installation logistics (fiber/copper runs, DAs, signal conversions), truck I/O relationships, direct client interaction. Daily changes and add-ons to accommodate talent/client.

Project Manager: Bryan Barry (VER)

iHeart Summer Festival – Miami, FL
June 2017

BOH Engineer, in charge of local crews for Load in/out (Forty TVs in multiple locations displaying multiple feeds), installation logistics (fiber/copper runs, DAs, signal conversions), truck I/O relationships, direct client interaction. Daily changes and add-ons to accommodate talent/client.

Project Manager: Bryan Barry (VER)

Premio Lo Nuestro – Miami, FL
February 2017

LED Manager. Responsible for large and diverse LED inventory including supporting hardware from start (Orlando prep) to finish.  Managed delivering the correct product to specified locations in sequential order as per CAD drawings. In charge of local crews and trucks logistics for Load in/out.

Project Manager: Joseph Denham (VER)

Made in America Festival – Philadelphia, PA
September 2016

Media Servers Assistant Engineer (roaming 4 separate stages). Installation logistics for Media Servers (fiber/copper runs, DAs, signal conversions). System testing and troubleshooting, daily changes and add-ons to accommodate talent/client.  Supervised local crew for Load in/out.

Project Manager: Tim Nauss (VER) 

The Audience Social Club – Coachella, CA
April 2016

 LED Technician. Installed LED wall, specialty LED products, media servers, scalers, signal converters, fiber/copper runs, and control surfaces. Actual Location: The Merv Griffin Estate. Indoor/outdoor event. Supervised  local crew for Load in/out.

Project Manager: Joseph “Fluffy” Denham (VER) 

Detroit Auto Show – Detroit, MI
December 2015

Systems & Media Servers Assistant Engineer. Equipment included: Eighty Folsom Image PRO II units, twelve D3 units, four Hyppotizer V4 units, eight Datapath X4 units, multiple DVI and network routers, KVMs, DAs, digital artists & programmers workstations, control surfaces, and multiple PIP TVs. 1,200 DMX universes.

Project Manager: Joseph “Fluffy” Denham (GPJ) 

LinkedIn Talent Connect – Anaheim, CA
October 2015

Systems Assistant Engineer, Shader (four cameras) and Video Recording (six decks with TC and reference). Prep in Glendale. Supervised local crew for Load in/out.

Project Manager: Joseph “Fluffy” Denham (VER)

MGX 2015 – Citrus Bowl - Orlando, FL
July 2015

Shader and Record Engineer on rehearsal and show day. Live outdoor corporate concert featuring Katy Perry and One Republic. Supervised local crew for Load in/out.

Project Manager: Joseph “Fluffy” Denham (VER)